Main tile installed

Update:01 Nov 2017
Summary:

1, in order to ensure that after the tile shop after th […]

1, in order to ensure that after the tile shop after the contours of the corridor, hanging bar installed after the installation, the tile should be taken before the vertical straight line. Practice: in the hanging tile side of the left and right sides of the mountain eaves set aside at 60mm to take the cornices straight line, and then from the eaves and roof, respectively, after the adjustment of the pre-tile adjustment, every two tile side of the ribs alignment (2) The width of the two pieces of tile can be adjusted from 597-599mm modulus to determine the longitudinal direction of the bomb. When the tiles are aligned with the lines, the roof tiles reach the level, vertical, and diagonal.

2, pre-tile process, that is, make full use of ribs 3mm adjustment position, for large roof can be adjusted into a whole piece. Narrow roof can be adjusted to the arch in the arch cutting. According to the different cornices, here refers to the double slope (herringbone) roof. The main tile laying lap can be a straight line, can also be staggered. Such as open structure roof truss must be in the two pavement at the same time on the tile, is strictly prohibited on the slope of the tile.
3, the official tile, the lower right corner of the eaves began from right to left, from bottom to top. The main tile should be fixed in accordance with the actual climate and typhoon conditions and roof slope with different fixed methods in the coastal or very few areas of the wind, the slope of 35 degrees above the roof or wall, must be fixed with a nail.
4, the width of the drainage ditch should be based on the size of the drainage area and the size of the regional rainfall decision. Determine the width of the drain after the ball on the tile, with electric hand-held circular saw cutting tiles. Drainage section of the tile cutting shop, with 1: 2 mortar tile will be the bottom of all the gaps in the blank pressure. Lead plate or galvanized steel pipe drain can be used to find mortar tiles. Cut the tile angle above the hole to fix it.